PLANNING AND CONTRUCTION PHOTOS - PAGE 5
< back | home | next > |
 |
|
 |
|
 |
|
 |
| 8/03/06 Put window in left sidewall
|
|
8/04/06 Riveted vent in top of trailer |
|
8/04/06 Put 25 CFM 120 VAC computer fan in bottom of roof vent |
|
8/08/06 Installed doorframe and test-mounted door |
| |
 |
|
 |
|
 |
|
 |
| 8/09/06 Put blue metal on door w/contact cement, pop-rivets |
|
8/11/06 Installed window in door |
|
8/31/06 Cut, glued, screwed, pop-riveted sheet metal to 3’L x 4’W flat hatch |
|
9/05/06 Built/installed metal splash shield behind stove |
| |
 |
|
 |
|
 |
|
 |
| 9/05/06 Hatch shown in down position |
|
9/13/06 Put diamond plate on rear end of trailer |
|
9/14/06 Put rear diamond plate piece over A/C door on w/glue, screws, and pop-rivets |
|
9/15/06 Hatch shown in down position |
| |