Fill construction
and Storm drain installation
After the trees and stumps were removed it was time to start importing fill material and installing storm drains. We started this project in the Spring of 2004. We imported 750 cu. yds. of fill dirt and 324 cu. yds. of rock.
Starting to move dirt to make room for the shop building
Preparing to bring in fill dirt
Shaping the surface drainage
Moving dirt and installing the storm drain
6 inch storm drain installation
Storm drain system under construction. The garage roof feeds into the small catch basin on the left which drains through the second catch basin, into the the concrete basin in the right hand photo, and then drains to daylight through the 6 inch pvc pipe.
Photo at left shows a retaining wall that we built to allow passage around the corner of the building.