The construction of our new house
begun with the sawing of white pine logs.
March 15, 2003 - The house is up to
the bottom of the windows.
March 22 - View through the kitchen
window.
This photo above gives a better idea
of the size – 20x26’. It still has one more log to go
on the top before the roof starts going on. Nine foot high
walls, then open to the roof over the living room, dining room,
kitchen. A loft/attic over the bedroom and bathroom.
Inside our house under construction on 12 April 2003
June 26, 2003 Moving from Otter Creek Log Works to building site.
House building home
bill0drew@netscape.net